Cwm Taf Water Supply Strategy
Investing in new and resilient water treatment works and associated facilities which will provide our customers with a safe, reliable supply of clean drinking water for decades to come.
Welcome to our consultation
30th October – 10th December 2025
The information on this consultation site outlines our proposal to upgrade our existing Llwyn-onn Water Treatment Works in Bannau Brycheiniog National Park, along with water storage facilities and new pipeline networks.
Once upgraded these new facilities will also replace the existing Cantref Water Treatment Works, which will be decommissioned.
This is a statutory pre-application consultation and is designed to share with you the need for the investment, our proposals, draft planning application documents, and receive your feedback ahead of us submitting out planning application to the relevant local planning authorities – Bannau Brycheiniog National Park and Merthyr Tydfil County Borough Council.
We’ve created a virtual consultation room where you will find information about the proposal and how you can provide your views. Please make sure you visit the additional information on the main table within the virtual room and provided on the screens.
Our virtual
consultation
Cwm Taf Water Supply Strategy - Llwyn-onn Water Treatment Works upgrade
A separate virtual consultation room is available for our proposed Dan-y-Castell Water Treatment Works and Pontsticill Pumping Station: dwrcymru.com/danycastellproposal
Click here for a guide to the technical documents below.
Draft drawing pack
Draft Llwyn-onn Water Treatment Works Upgrade Chemical Building 1 - Existing Elevations and Sections
Draft Llwynonn Water Treatment Works Upgrade Chemical Building 3 Proposed Plans Elevations and Sect
Draft Llwynonn Water Treatment Works Upgrade Chemical Building 4 Proposed Plans Elevations and Sect
Draft Llwyn-onn Water Treatment Works Upgrade Chlorine Contact Tank - Proposed Elevations
Draft Llwyn-onn Water Treatment Works Upgrade Chlorine Contact Tank - Proposed Ground Floor Plan
Draft Llwyn-onn Water Treatment Works Upgrade Chlorine Contact Tank - Proposed Roof Plan
Draft Llwyn-onn Water Treatment Works Upgrade Chlorine Contact Tank - Proposed Sections
Draft Llwyn-onn Water Treatment Works Upgrade Chlorine Contact Tank -Proposed Basement Floor Plan
Draft Llwyn-onn Water Treatment Works Upgrade Clean Water Tank - Proposed Elevations
Draft Llwyn-onn Water Treatment Works Upgrade Clean Water Tank - Proposed Ground Floor Plan
Draft Llwyn-onn Water Treatment Works Upgrade Clean Water Tank - Proposed Roof Plan
Draft Llwyn-onn Water Treatment Works Upgrade Clean Water Tank - Proposed Sections
Draft Llwyn-onn Water Treatment Works Upgrade Dirty Backwash Tank - Existing Elevations
Draft Llwynonn Water Treatment Works Upgrade Dirty Backwash Tank Existing Plan Sections
Draft Llwyn-onn Water Treatment Works Upgrade Emergency Stand by Generators and Bulk Storage Tank
Draft Llwyn-onn Water Treatment Works Upgrade Existing Chemical Building 1 - Plan
Draft Llwynonn Water Treatment Works Upgrade Existing Inlet and Dissolved Air Flotation Proposed Pl
Draft Llwyn-onn Water Treatment Works Upgrade Existing Inlet and Dissolved Air Flotation Elevations
Draft Llwyn-onn Water Treatment Works Upgrade Existing Location Plan
Draft Llwyn-onn Water Treatment Works Upgrade Existing Manganese Building - Elevations
Draft Llwyn-onn Water Treatment Works Upgrade Existing Manganese Building - Plans
Draft Llwyn-onn Water Treatment Works Upgrade Existing Manganese Building - Section
Draft Llwyn-onn Water Treatment Works Upgrade Existing Site Plan
Draft Llwynonn Water Treatment Works Upgrade HV Switch Room Proposed Plans Elevations and Section
Draft Llwyn-onn Water Treatment Works Upgrade Proposed and Existing Site Elevations
Draft Llwyn-onn Water Treatment Works Upgrade Proposed Site Elevations
Draft Llwyn-onn Water Treatment Works Upgrade Proposed Site Layout Plan
Draft Llwynonn Water Treatment Works Upgrade Site Location Plan Biodiverse and Sedum Roof
Draft Llwynonn Water Treatment Works Upgrade Supernatent Tank Proposed Plans Elevations Sections
Draft Llwyn-onn Water Treatment Works Upgrade Transformer Proposed Plans Elevations and Sections
Draft Llwynonn Water Treatment Works Upgrade TransformersProposed Plans Elevations and Sections
Draft Llwyn-onn WTW Upgrade RGF Building, Ozone Generation Contact Tank & Low Lift Pumping Station - Proposed Roof Plan
Draft Llwyn-onn WTW Upgrade RGF Building, Ozone Generation Contact Tank & Low Lift Pumping Station - Proposed Elevations
Draft Llwyn-onn WTW Site Location Plan
Draft Llwyn-onn WTW upgrade - overview of the proposed development
Draft Llwyn-onn Water Treatment Works Upgrade Granular Activated Carbon (GAC) Building & Chemical Building 2 - Proposed - Elevations
Draft Llwyn-onn Water Treatment Works Upgrade Granular Activated Carbon (GAC) Building & Chemical Building 2 - Proposed Floor Plan
Draft Llwyn-onn Water Treatment Works Upgrade Granular Activated Carbon (GAC) Building & Chemical Building 2 - Proposed Roof Plan
Draft Llwyn-onn Water Treatment Works Upgrade Granular Activated Carbon (GAC) Building & Chemical Building 2 - Proposed Sections
Draft Llwyn-onn WTW Upgrade RGF Building, Ozone Generation Contact Tank & Low Lift Pumping Station - Proposed Sections
Draft Llwyn-onn WTW Upgrade RGF Building, Ozone Generation Contact Tank & Low Lift Pumping Station Proposed Ground Floor Plan
Draft Planning Statement
Draft Llwyn-onn Planning Statement
Draft Design and Access Statement - Upgrade of Llwyn-onn Water Treatment Works
Draft Design and Access Statement – Upgrade of Llwyn-onn Water Treatment Works
Draft Habitat Regulations Assessment
Draft Habitat Regulation Assessment
Draft Arboricultural Impact Assessment
Draft Arboricultural Impact Assessment
Draft Outline Lighting Strategy
Draft Outline Lighting Strategy
Draft Outline Site Waste Management Plan
Draft Outline Site Waste Management Plan
Draft Transport Statement
Draft Transport Statement
Draft Outline Construction Traffic Management Plan
Draft Outline Construction Traffic Management Plan
Draft Green Infrastructure Report
Draft Green Infrastructure Statement
Draft Phase 1 Contaminated Land
Draft Phase 1 Contaminated Land - Part 1
Draft Phase 1 Contaminated Land - Part 2
Draft Phase 1 Contaminated Land - Part 3
Draft Phase 1 Contaminated Land - Part 4
Draft Phase 1 Contaminated Land - Part 5
Draft Environmental Statement and Non-Technical Summary
Draft Volume 1 - Main Text
Draft Volume 2 - Technical Appendices - Appendix 8M-N
Draft Volume 2 - Technical Appendices - Appendix 1-7
Draft Volume 2 - Technical Appendices - Appendix 8 E
Draft Volume 2 - Technical Appendices - Appendix 8A
Draft Volume 2 Technical Appendices Appendix 8A2
Draft Volume 2 - Technical Appendices - Appendix 8B
Draft Volume 2 - Technical Appendices - Appendix 8E
Draft Volume 2 - Technical Appendices - Appendix 8G
Draft Volume 2 - Technical Appendices - Appendix 8H
Draft Volume 2 Technical Appendices Appendix 8H2
Draft Volume 2 Technical Appendices Appendix 8H3
Draft Volume 2 Technical Appendices Appendix 8H4
Draft Volume 2 Technical Appendices Appendix 8H5
Draft Volume 2 Technical Appendices Appendix 8H6
Draft Volume 2 Technical Appendices Appendix 8H7
Draft Volume 2 - Technical Appendices - Appendix 8I
Draft Volume 2 - Technical Appendices - Appendix 8J-K
Draft Volume 2 - Technical Appendices - Appendix 8L1
Draft Volume 2 - Technical Appendices - Appendix 8L 2
Draft Volume 2 - Technical Appendices - Appendix 8O-Q
Draft Volume 2 - Technical Appendices - Appendix 8R Part 1
Draft Volume 2 - Technical Appendices - Appendix 8R Part 2
Draft Volume 2 - Technical Appendices - Appendix 8R Part 3
Draft Volume 2 Technical Appendices Appendix 8R2
Draft Volume 2 - Technical Appendices - Appendix 8S-U
Draft Volume 2 - Technical Appendices - Appendix 8V
Draft Volume 2 Technical Appendices Appendix 8V2
Draft Volume 2 - Technical Appendices - Appendix 8W-Y
Draft Volume 2 - Technical Appendices - Appendix 9-14
Draft Volume 3 - Figures - Part 1
Draft Volume 3 - Figures - Part 2
Draft Volume 3 - Figures - Part 3
Have your say
We want to hear your views.
Please take the time to read our consultation materials and then complete our forms to share your feedback.
There are separate forms for each proposal so we can ensure that any feedback received will be specific to each proposal. We have colour coded the forms for clarity. We welcome and encourage feedback on both proposals, for those who wish to comment on both you will need to complete the two feedback forms.
How to submit your feedback
You can provide feedback online here.
Thursday 6th November - 3pm-6pm at Pontsticill Memorial Hall, Vaynor Road,CF48 2RU.
Thursday 13th November - 2pm-7pm at Cefn Coed Community Hall, New Church Street, CF48 2NA.
Wednesday 26th November - 3pm-6pm at Nant Ddu Lodge & Spa, CF48 2HY.
Thursday 4th December - 1pm-5:30pm at Merthyr Tydfil Central Library, High Street, CF47 8AF.
Post your response form to: Freepost, Dŵr Cymru Welsh Water
Our feedback form is available to download here.
If you prefer to email us your feedback to email us at cwmtafproject@dwrcymru.com.
If you are unable to respond via one of the above channels, please call us on 0800 052 0130 to discuss alternative ways of sharing your feedback. (General enquiries 8am-6pm Mon-Fri, 9am-1pm Sat).
The closing date for responses is 23:59 on Wednesday 10th December 2025.
Your feedback is important to us. The feedback received as part of this consultation will be taken into consideration as we finalise our application. The comments raised, and how we considered them, will form part of our final planning application submission - set out in the Pre-application Consultation Report.